Year: 2021. Client: IREKS AROMA D.O.O. Location: Croatia
Relocation of SS, MV and LV cable connections
In 2021, for the customer Ireks Aroma, HELB relocated the substation and its medium-voltage and low-voltage cable connections. The work included construction of SS 20/0.4 kV, 1×1000 kVA, factory production of low voltage supply and distribution plant with reactive energy compensation cabinet, production of LV supply and distribution switchgear, laying and connection of MV and LV cables, dismantling of existing SS, and final tests, measurements, and commissioning. The second phase included supply, delivery, and installation of the SS housing, and electrical installation work inside the substation.