Year: 2018. Client: CROSCO Oil Services Ltd Location: Ukraine
Winterization of the drilling plant E-401
HELB has prepared a drilling plant EMSCO 605 for CROSCO, which performs explorational drilling with UkrGasVydobuvanny (UGV) Pjsc, a Ukrainian state company, one of the largest oil and gas companies in Ukraine.
HELB’s job included replacement of the MCC (Motor Control Unit) connectors, cable and connector at the drilling plant, PCR (Power Control Room) cooling units, complete lighting of the drilling plant and the delivery of complete equipment. In addition, the scope of work included a primary current injection circuit-breaker test, as well as a test of transient resistance of the bus system in PCR and MCC. It is important to note that all supplied flexing cables, connectors as well as external LED lighting are designed for operation in subarctic conditions, i.e. for temperatures up to -40 ° C.